Projects
CategoryBlumer-Lehmann visit – Feb. 13-18
A visit to Blumer-Lehmann to discuss the impending secondment and how the research could be integrated.
Molds and prototypes
Quick update to show some photos of molds and the laminating process. Progress is much slower than planned and we experienced some setbacks – technical and scheduling – but things are moving and slowly improving.
Data management and a workpiece model
Data management issues and the development of a flexible workpiece model to cross-reference and contain fabrication data for individual glulam components.
McNeel Global Developer Meeting 2016
On October 11-14, Innochain ESRs Angelos Chronis (ESR 03 – Integrating Building Physics for Performance Control) and Evy Slabbinck (ESR 02 – Integrating Isogeometric Analysis) participated at the McNeel Global Developer Meeting, where they had the opportunity to meet the McNeel Development team...
ELYTRA FILAMENT PAVILION
The Elytra Filament Pavilion is the central installation of the Engineering Season at the Victoria and Albert Museum in London, which highlights the creative potential of integrated design engineering through a series of exhibitions and events.
CITAstudio Glulam Workshop: September 5-16
A workshop for CITAstudio Masters students to explore the design and fabrication of five speculative glulam blank types, and to move through the design-to-production chain from schematic design to machining connection details.